
PILOT & VALIDATION PROGRAM
Test FlowGate in your real operations before scaling.
For applications where fluid behaviour, oxygen demand, solids loading, or approval requirements need real-world validation, FlowGate pilot projects provide a structured path to evaluate performance before wider deployment.
WHEN A PILOT MAKES SENSE

Your fluid is difficult, variable, or high in solids.

Your current aeration system clogs, fouls, or cannot keep up
You need proof before a larger purchase

You want site-specific observations before scaling.

You are evaluating a new process, waste stream, pond, lagoon, or treatment system.
NOT EVERY PROJECT NEEDS A PILOT
READY TO INSTALL?
If your application is straightforward and you are ready to integrate FlowGate hardware, you can purchase a built-to-order aerator assembly directly.
NEED VALIDATION FIRST?
If your application requires testing, performance review, or stakeholder approval, a pilot project can help validate fit before scaling.
WHAT WE EVALUATE

Fluid type & viscosity

Solids, fibers, debris, and fouling risk

Tank, basin, pond, or lagoon geometry

Depth and available blower capacity

Oxygen demand, odor, or anoxic conditions

Mixing, circulation, and solids suspension

Maintenance problems and failure points

Scale-up requirements
WHAT'S INCLUDED
Application review
We review your system, fluid conditions, operating goals, and installation constraints.
Pilot configuration
We recommend a FlowGate assembly configuration matched to your application.
Built-to-order assembly
Pilot hardware is supplied based on the selected configuration.
Startup guidance

